ONE Mission Bay continues to take shape as the opening date quickly approaches. All the windows of the exterior of the building have been installed giving gorgeous shape to both the Park and Tower buildings. The highly anticipated amenity deck has just been framed and is that much closer to all the BBQs, lounging, swimming, and gatherings that will certainly take place there in the near future. Simultaneously, the carefully curated interiors are slowly coming together with many of the entry doors to the residences set in place, walls up, and modern kitchen and bath cabinetry installed. Two residences have been completed in their entirety showcasing how beautiful the interiors are in their actual space. Sneak a peek at our pictures below!